pcb.esp32s.com · Engineering to production

Metal Core PCBs

Plan a metal-core PCB for applications where heat transfer is an important design requirement. Send pcb.esp32s.com your board files and thermal requirements to review the appropriate construction.

Request a Metal Core PCB QuoteContact support

Plan your project

Describe the thermal path

Identify heat-generating components and how the board connects to the heatsink or enclosure. Base-metal conductivity alone does not describe the whole thermal path.

Specify insulation needs

Include electrical isolation requirements, copper weight and any dielectric requirements. Material suitability must be assessed for the intended application.

Include mounting details

Show mounting holes, clearances, cutouts and critical dimensions. Share the surface finish and assembly requirements with the fabrication request.

Prepare your files

Use the preparation guide to collect the information for this service. Keep file names and revision notes consistent, and identify any requirement that is essential to your application.

From enquiry to order

  1. Submit the request. Open the online PCB quote above, select Aluminum or Copper Core under Base Material, and upload your files. Configure the specifications and quantity, then add to cart or submit a quotation request using the options shown.
  2. Review the details. Confirm the proposed construction, pricing, production lead time and any open questions.
  3. Approve the order. Check the accepted specifications, delivery address and shipping option before proceeding.

Common questions

How are price and lead time confirmed?

They depend on the reviewed files, materials, quantity and process requirements. Use the quotation and order confirmation for your project; production time and shipping transit time are separate.

What if my requirement is not listed?

Include it in your request or contact pcb.esp32s.com support before ordering. Special materials, tolerances and inspection requirements need explicit confirmation.

Useful next steps